Customer Site Solution – McCormick Contracts

Project Type
Foundation and Structural Excavation
Client
McCormick Contracts, Northern Ireland
Overview
McCormick Contracts needed to maintain tight timelines while achieving millimetre-level precision on variable ground conditions.
Challenge

Varying soil composition and changing depths across the site increased the risk of uneven foundations and rework.

Our Solution

Innovate delivered a fully calibrated setup combining Leica MC1 machine control with the Steelwrist X18 tiltrotator. On-site calibration and support from Innovate’s engineers ensured the system performed seamlessly from day one.

Results
  • Consistent accuracy across footing levels
  • Reduced survey call-outs
  • Reliable daily reporting through MC1 connectivity
  • Enhanced productivity and schedule control